Floor Cleanout Requirements

Astm d2729 poly vinyl chloride pvc sewer pipe dimensions dimensions of poly vinyl chloride pvc sewer pipes with belled end.
Floor cleanout requirements. No under floor cleanout shall be located exceeding twenty 20 feet 6 096 mm from an access door trap door or crawl hole. Or use the top of the crawlspace floor if the only area that has proper openings is the garage. Cleanouts zurn plumbing products groupspecification drainage operation 1801 pittsburgh avenue erie pa 16502 phone 814 455 0921 fax. A two way cleanout installation that is approved for meeting the requirements of section 708 1 3.
They look like capped pipes sticking a few inches above the ground. A drain cleanout provides access to your main sewer line and is located outside of your home in the front or back yard. 3 1 2 22126 007 4 1 2 22126 008 5 1 2 22126 009 6 1 2 22126 001. A cleanout installed in a floor or walkway that will not have a trim cover installed shall have a countersunk plug installed so the top surface of the plug is flush with the finished surface of the floor or walk way.
Use the top of the crawlspace under floor space floor or the garage floor whichever is lower if neither the crawlspace nor the garage has proper openings. 2017 fbc plumbing 6 th edition 7 sanitary drainage 708 cleanouts 708 1 cleanouts required. Capacities of sewer pipes carrying capacity of sewer and wastewater pipes gpm and liter per second. Upc 707 11 cleanouts shall be provided for pressure drainage systems as classified under section 710 7.
Following guidelines to determine the lowest floor for rating. Pumps or ejectors that. The cap closer to your home provides easy access to the city end while the cap closer to the street allows you to maintain the house end of the lateral. Upc 707 10 cleanout fittings shall be not less in size than those given in table 7 6.
2 or with a lock in design to receive terrazzo or ceramic tile fill fig. All three types of finished floor tops are available in round or square patterns. Cleanouts typically go unnoticed until there is a problem. A sewage pump or sewage ejector shall have the capacity and head for the application requirements.
708 1 9 required plumbing drain clearance cleanouts for 6 inch 153 mm and smaller piping shall be provided with a clearance of not less than 18 inches 457 mm from and perpendicular to the face of the opening to any obstruction. Tops are available with a shallow depression to receive vinyl or sim ilar types of floor tile fig. Dimensions sizes and dimensions of pipes and tubes and their fittings inside and outside diameter weight and more.